BARRIO ZOOM

Building Projects

2012 – Project 1

  • Duration: 8.5 months
  • Built 18 homes
  • Built the school
  • Started up medical clinic using the school as temporary space
  • Install a new underground water system in the barrio

bbnew with cancha and comment

2013 – Project 2

  • Duration: 5.5 months
  • Built 20 homes
  • Built the Medical Clinic

 

2014 – Scholarships

  • Donors provided 27 scholarships to Cadin School
  • 6 students are now in university
  • 3 are entering medical school
  • One student is graduating with a university degree in nursing

 

2015 – Project 3

  • Duration: 2 months
  • Built 4 homes
  • Built an new bedroom onto an existing house
  • Replaced the roof on an existing house
  • Replaced the wood siding on one house